The Challenge

As the primary corridor for vehicles moving in and out of the city’s downtown core, the I-280 is vital for San Francisco traffic flow. To avoid major traffic disruptions for residents, repair work on a bridge hinge located on the highway’s Southern Freeway Viaduct required careful scheduling and logistics. Foremost among the planning concerns was concrete mixing, batching, and placement technique. Each hinge reconstruction consisted of four distinct types of concrete, so customization and batch speed would be crucial to project success.

The Solution

After careful consideration, a contractor using ProAll Volumetric Mixers was chosen for the job. The continuous pour capabilities of volumetric mixers were advantageous, as the concrete materials could be constantly replenished during placement for as long as necessary. The versatility offered by being able to adjust the mix on demand was also a meaningful benefit. The contractor was able to control the mix with admixture adjustment as the temperature varied and as the placement needs varied. There was no dead time waiting for strengths. The working time was engineered to be about an hour, so by the time the top of a stem was finished, the soffits achieved final set. Thanks to the unique advantages of mobile mixers, the bridge reconstruction was a resounding success.

Mix Design

The engineers and construction managers on the job—Ric Maggenti, Sergio Gomez, and Roberto Luena—explain the concrete work for the project: “Each hinge reconstruction consisted of four pours: stem and soffit on the seat side, stem and soffit on the support side, deck pour seat side and finally deck pour supported side. Barriers and joint seals were the last order of work, notwithstanding clean-up and traffic markings.”

The mix design, which was based on an award-winning freeway project on the Pomona Freeway, required reports detailing the volume of ingredients per time, which were supplied using automatic dispatching tickets from the mixer, which also displayed real-time metering continuously on a digital monitor. All proportion checks, samples, and tests passed easily and the concrete easily complied with all structural specifications.

There's a ProAll for that.
53FT
WIDE

BRIDGE PROJECT

100
HOUR

ROAD CLOSURE LIMIT

16
DIFFERENT

MIX DESIGNS

The contractor’s crews were openly impressed as to how soon forms could be stripped so as to move on to the next operation.

Roberto Luena, Engineer
  • caseStudy Accelerated Bridge Construction with Volumetric Mixers blockquote1
  • caseStudy Accelerated Bridge Construction with Volumetric Mixers blockquote2 v2
Model is: P50
mixers overview model P50 SideView 1440x702
Try it with

P50

Don’t let the ProAll P50’s size fool you. This nimble machine has the dexterity to navigate tight spaces like city streets with the same throughput capacity of a larger model.

Learn More

Next Case Study

Spotlight: Fibre-Reinforced Concrete Slabs

The Torre Glorieta’s pristine polished floors were accomplished in two ways. Firstly, no wire mesh was used. Instead, synthetic fibre was added to the cement powder to reduce the cracking that concrete suffers during the hardening process.

Read More
caseStudy spotlight fibre reinforced concrete slabs header 1920 v2

Contact Us Today!

Whether you’re new to volumetric mixers, need a quote, or a spare part - we’re here to help.

Get In Touch